PT Indofood Sukses Makmur has appointed PT BITA ENARCON ENGINEERING (BITA) to provide Engineering Design and Construction Supervision Services for a New Noodle Factory Development at Jalan Raya Cirebon-Tegal Km 18, Desa Ender, Kecamatan Astanajapura, Cirebon, West Java. The total area is 114,580 sqm area with 77,000 sqm for Noodle factory area, 37,580 sqm for Non-factory area and 41,644 sqm for estimated floor area.
The scope of work are consist of:
- Site Work Assistancy: Development of 7.7 Ha Noodle Factory area including Fencing, Drainage, Road, Parking, Loading & unloading area, including at Noodle Factory building, Waste Water Treatment and Water Treatment (system by others)
- Architecture and Engineering Design (A/S/C/M/E) of noodle factory building area work which consist of Noodle factory builsing, workshop, mushola, branch office building, clinic building, koperasi builing, SPSI building, boiler and coal storage building and miscellaneous buildings.
- Mechanical & Electrical installation works which consist of Power and lighting, Water, Steam, Air, Fire and hydrant, Telephone, data and sound system, Lightning, CCTV and security system, HVAC and ME process.
- Tender process.
- Site supervision.