Client
Mitsubishi Hitachi Power Systems, Ltd
Location
Tanjung Priok, Jakarta
Core of Business
Power Industrys Infrastructure
Scope of Work
-
Description
Mitsubishi Hitachi Power Systems, Ltd. (hereinafter called MHPS) has already been awarded by PLN as the winner of the bidding process for Jawa-2 800 MW Combined Cycle Power Plant (CCPP) Project. The Project Site is located in Tanjung Priok in the north-east portion of Jakarta City, approximately 10 km from central part of Jakarta City and 20 km east of Soekarno-Hatta International Airport.MHPS has appointed PT Bita Enarcon Engineering (BITA) for providing Engineering Services for Civil, Structural and Building Works of Jawa-2 Combined Cycle Power Plant Project.  The scope of works shall cover but not lmited to: -    Structural calculations -    Detailed Engineering Design (DED) drawings documentation consist of :Architectural drawingsConcrete structural drawingsSteel structural, platform & staircase drawingsDrainage drawingsSite Grading & Underground Utilities drawings
Sharing this page :